What is the Replacement Process of SMT Feeder?

1. Take out SMT Feeder and take out the used paper plate.

2. SMT operator can take material from the material rack according to their own station.

3. The operator checks the removed material with the work position chart to confirm the same size and model number.

4. The operator checks the new pallet and the old pallet, and checks whether the specifications and models of the two pallets are exactly the same.

5. Operator inspection of its material can indicate whether the enterprise is consistent with the pallet.

6. If the above inspection is abnormal, the SMT operator should immediately notify delay processing.

7. Samples are taken from the new pallet and the material can then be parked on an old and new pallet.

8. Take the newly installed Feeder material and paste it on the refueling process record sheet, fill in the refueling working time, operator management and other relevant data and information.

9. According to the SMT machine station to install Feeder to pick and place machine; You must make a valid record of filling out your supplementary information.

10. The operator notifies the engineering quality management personnel of material matching and testing, and material changes and inspection must be carried out.

11. IPQC checks whether the data and information can be correctly developed and whether the site can be correctly developed according to the site number table.

 